mitigation of overcrowded mobilehomes by relocating families within Mountain View.
Last February, while making plumbing repairs to the bathrooms in the community building, workers discovered the dry rot and termites. Further investigation uncovered water leaks that had eroded the foundation, forcing the bathrooms to be closed until repairs are made.
The scope of work being proposed includes new sewer and water lines, a new concrete slab, new framing of structural members and bearing walls, new electrical system, new drywall and flooring, and new bathrooms that will meet the Americans with Disabilities Act (ADA) requirements.
In addition to the work expected to be performed by Gonzales, city staff will soon solicit bids for infrastructure upgrades throughout Mountain View, including replacement of existing electrical systems,installation of natural gas lines, replacement of water and sewer lines, installation of underground lines for cable, television and telephones, installation of on-site fire hydrants, and the re-grading and repair of interior roadways.
In addition, city staff is developing a mobilehome replacement program for future Council consideration that would assist low-income residents in upgrading or replacing their current homes. Staff anticipates returning to the council with both proposals in the spring, according to a city staff report.
Mountain View was built in the early 1950s and originally included 141 lots. It now has 105 rent-controlled spaces.
Funds for the contract with Gonzales are available in the TORCA Affordable Housing Trust Fund, which receives money from property owners who convert apartments into condos. The money is used specifically for the construction, rehabilitation or financing of low-income housing.
Originally published in the Santa Monica Daily Press print edition on February 13, 2007. Read the original PDF.